Opening Hours: Mon - Sat 8.00 - 18.00

Manufacturing

Well connected by roadways, our manufacturing facility is built up at 635, GIDC Estate, Waghodiya, Vadodara. The plant is built as per latest Schedule “M” specifications, GMP & WHO norms.

The site is equipped with other essential elements like adequate supply of power, water, good hygiene, transport facilities and is free from sanitary and environmental hazards like pollution, sewage contamination etc. company has certified approval from Gujarat Pollution Control Board also.

The design and control of the facilities ensure that the cross contamination and mix-ups are controlled to highest levels. State of the art equipment and instruments have been provided.

All doors and view panels of the building are made up of Sandwich panels and are double flushed so as to ensure uni-directional flow of operations. The factory passage is a pressurised corridor with the positive pressure that prevents cross contamination. Site is maintained in a manner that the products are manufactured and stored in conditions suitable to maintain quality and efficacy.

By our systems and procedures, we ensure that we provide the products complying with international standards and Our “QUALITY” philosophy is a synthesis of World Guidelines, law, regulations and human requirements, which helps us to cater to best needs of our customers.


MANUFACTURING CAPACITY(SPARE CAPACITY)

DOSAGE FORMS Type Per Day Per Month
TABLETS GENERAL 8.0 Lacs 240 Lacs
BETA LACTUM 4.0 Lacs 120 Lacs/A
CAPSULES GENERAL 12 Lacs 360 Lacs
BETA LACTUM 2 Lacs 60 Lacs/A
ORAL LIQUIDS (Bottles) SYRUP 15,000 4.50 Lacs
SUSPENSION 10,000 3.00 Lacs/A
OINTMENTS (Tubes) OINTMENTS 3,000 3,000
CREAMS 0.90 Lacs 0.90 Lacs/A

EQUIPMENTS AND MACHINERY:

LABORATORY:

MICRO LAB:

GENERAL:

 

TABLET DEPARTMENT (Beta Lactum):

LIQUID PACKING & LABELING (General, Fully Automatic):

TABLET COATING:

PACKING:

OINTMENT FILLING & PACKING:

HVAc SYSTEMS:

In order to fulfil the requirement for fresh filtered air from different production departments, the premise is fitted with 27 Air Handling units to ensure flow of fresh filtered air of class 1 lac.

All HVAc systems have 10 micron pre filters & 5 micron fine filters and 3 micro hepa filters. This design has been developed to maintain a temperature of 23 +/-2’o C & RH~40 in the manufacturing area.